Uncategorized

Provo Solar Install

By September 28, 2020 September 30th, 2020 No Comments
McMurdie Residence

Utah County Solar Panel Installation

Redstone Solar designed and installed this 18 panel solar system in Provo Utah, South of Salt Lake City. This installation uses the latest technology from LG, Solaredge,  and SnapNrack to provide this home with clean, sustainable power. This system produces over $1600 in electricity each year and is projected to produce $64,000 in electricity for over 25 years. Redstone Solar worked with local municipalities to help provide this Provo Utah customer with tax rebates and incentives saving them an estimated $8,000 on the cost of the system.

Product Details

Solar Array Size– 6.4 kW
First year Production – 11,400 kWh
First year Savings – $1600
Solar Panel Manufacturer – LG Solar USA
Inverter Manufacturer – Solaredge
Attachment Manufacture – SnapNrack

brandan

Author brandan

More posts by brandan

Leave a Reply